IP Explanation Estimated Release Date: Closed Proposed Resolution: MOTOR sated: After review, we have determined that the roof refinish time does not include the underside. Please consult the list of not-included items under basic color coat application in the MOTOR Guide To Estimating. Always consult the Guide when developing an estimate.
Inquiry Type: Procedure Page Issue
Description: Roof Underside